Brian Arden Winery

Construction of a new winery including the associated site work.  This project included a large, 20 feet tall, cast in place concrete wall with a future cave portal cut into a slope much like the proposed condition of the Von Strasser project. The winery consists of two buildings with a crush pad between them.  There is a two story 6,193sqft. Winery Operations Building and a separate 4,286 sq.ft. Production Building. The site work for this project included a storm water retention system, domestic waste, including a grease trap for the kitchen, and a hold and haul process waste system. The production building includes a tank room, and a barrel storage room.  Cat walks were installed.  The project also included a boiler for production hot water, an air compressor and hose stations with the associated piping for winery production, and a night air cooling/CO2 removal system. The winery operation building includes area for future tasting room, a commercial kitchen, bathrooms, second floor break room, restroom and offices.