completed-signature-project
 

The main feature and focal point of this modification was the rebuild of the Sanctuary platforms allowing for the installation of a walk in baptismal pool, stone font and structural wall supporting a 35' high glass art wall. Additional upgrades included wood inlays into existing travertine, decorative interior slate wall assemblies and creation of new work spaces inside the church.  Upgrades to the HVAC, sound and lighting systems to better service the church were also completed.

st_johns_baptist_stainebig st_johns_baptist_cross st_johns_baptist_church St. Johns the Baptist

 

See More...

 

New full service mortuary facility located at Tulocay Cemetery Napa CA. This facility includes embalmings, arrangement and selection areas for funeral service requirements, visitation and chapel as well as indoor and outdoor reception facilities. This structure is a 14,500 sqft single level structure wood framed, slab on grade construction. Site work included extensive hard rock removal and soils preparation. All storm drainage water will be recycled and reused as landscape irrigation collected in under ground Atlantis rain tank systems. Bruce Tucker Construction completed foundation, framing and finish on the project with it's own forces.

Tulocay

See More...

 
Project included remodel of the interior of the existing metal building to create the new art studio. Also included with these improvements were new mezzanine assemblies for the office and storage areas, interior shop area housing sand blast, enameling, kiln, wood and metal shop rooms. All utilities: fire, water, and power services were upgraded.  

Gordon Huether Studio

 

See More...

 

Seismic retrofit to the St. Helena Catholic Church. Project includes removal and reinstallation of exterior work and interior finishes for the same seismic work. Seismic Upgrade and Restoration of original stone church was built in 1887 and reconstructed in 1946. The scope includes drilled piers, perimeter grade and tie beams around the exterior of the church. Removal of existing stone, cut back and reinstallation of stone buttresses after concrete butress have been installed. The balance of exterior work includes ADA compliance at entry areas and ramps. Interior scope includes - 3 story demolition and installation of shot crete at Nave and entry and baptistry. Misc interior shot crete, structural bond beams, anchors and foundation assemblies thru out the church. Finishes - Interior plaster at new shot crete walls, rebuild of choir loft , confessional booths and altar modifications, flooring and repaint of interior of structure in it's entirety. All concrete frame and finish carpentry work completed by Bruce Tucker Construction employee's.

st-helena-catholic-church

See More...

 
More Articles...